What We do

Consulting Flip Cards
GOVERNMENT SERVICES
We perform detailed electrical and mechanical analysis of legacy assemblies by regenerating
  • Complete schematics
  • Layer-accurate PCB databases
  • Bills of materials (BOM)
  • Functional descriptions
  • Timing behavior
OPERATIONAL CONSULTING
After the hardware is understood, our team can redesign it to
  • Replace discontinued semiconductors with current parts
  • Increase efficiency and reliability
  • Add features required by today’s applications
  • Create manufacturable files for low- to mid-volume production
PROJECT MANAGEMENT
All projects deliver full reproducible engineering packages
  • Source CAD files
  • Updated BOM with vetted suppliers
  • Test procedures and acceptance criteria
  • Manufacturing and assembly drawings
MANAGEMENT
  • Manufacturers that still need out-of-production electronics
  • Defense and aerospace programs with long service lives
  • Industrial equipment tied to legacy control platforms
  • Organizations seeking U.S.-based sustainment rather than overseas cloning

Agile Engineering

Agility bridges past technology and future requirements so your products never reach a dead end. Our engineers can take existing hardware with little or no documentation and recover the original design intent, recreate accurate schematics and PCB layouts, identify modern replacements for unavailable components, and redesign the product for continued manufacture in the U.S.

ELECTRONICS

Custom, highly reliable electronics production solutions for the harshest environments, including MIL-SPEC.

MACHINED HARDWARE

Quality parts, built to last.

AGILE DESIGN

Reverse engineering and redesign of electronics cards and end of life power supplies.

Agile Manufacturing


Manufacturing of boutique small prototypes through low-rate production of hardware systems and sub-systems, enabling our customers to buy American products.

Agile Integration Cards
We excel in developing, integrating, and delivering cutting-edge software, components, and equipment for defense and space applications.
Leveraging model-based system engineering and advanced modeling techniques, we ensure robust, scalable solutions that meet the complex demands of high-stakes environments.
Our expertise in modular open systems facilitates adaptable and interoperable systems, while our commitment to rigorous software and system engineering practices ensures top-tier performance and reliability.
Through comprehensive analysis and innovation, we provide state of the art solutions that drive technological advancement and mission success.

Agile Integration


CORPORATE STRATEGY

We provide advice to help structure companies to enter the government market and be successful. We specialize in helping companies in the manufacturing sector position themselves to team and compete for success with acquisition, design, engineering, and manufacturing projects.

GOVERNMENT SERVICES

We directly support the needs of the Federal and State Governments through acquisition, engineering and manufacturing consulting services. We partner directly with multiple agencies, prime vendors and subcontractors to provide high-quality, professional support for almost any need.

OPERATIONAL CONSULTING

Our experienced team can help you increase agility on your manufacturing lines, achieving maximum operational efficiencies and increasing your bottom line. We are uniquely qualified to assist manufacturers improve their processes and products.

PROJECT MANAGEMENT

Our Defense Acquisition Workforce Trained and PMP certified personnel have decades of experience managing projects throughout defense and commercial industries. Let us organize your team, optimize resources, give feedback on strengths and weaknesses, and create highly collaborative teams for each project.

Agile Consulting

Agility provides business-to-business, business-to-government, and advisory services to support technology, engineering, and manufacturing projects and programs of all sizes.